Moving a water right's point of diversion, place of use, purpose, or place of storage — the most common thing a Montana water right owner needs, and the easiest to get wrong.
- DNRC form
- Form 606
- The clock
- Statutory clocks, not an estimate: 180 days for your follow-up after a preapplication meeting, 45 days for DNRC's technical analyses, 120 days to answer a deficiency letter. The elapsed total depends on your file.
- Anchored to
- §85-2-402, MCA§85-2-302, MCAARM 36.12.1501
- Checked against DNRC
A water right is tied to a place, a purpose, and an amount. Change any of those — move the point of diversion, irrigate different ground, switch from irrigation to stock or municipal use, put the water in a different reservoir — and you need DNRC’s authorization first.
The part people underestimate. A change is not a paperwork exercise. Under §85-2-402, MCA, you have to prove the change will not adversely affect anyone else’s water right, and that test runs through historical use: what the right actually produced, on the ground, over a representative period. A right decreed for 500 acres that only ever irrigated 300 changes as a 300-acre right. The analysis is where these applications live or die, and it is the reason a file assembled from the abstract alone tends to come back.
What changed in 2024. HB 114 rebuilt the process, effective 2024-01-01. There is now a formal preapplication track: a meeting with the Department, $500 credited toward your application fee, and in exchange a discounted filing fee and expedited processing. Most applicants don’t know it exists and pay full freight for a slower file.
Where I sit. I reviewed applications like this for the Department, then ran the program that reviewed them. I know what the analysis has to survive because I used to be the one it had to survive.
Why these come back
The failure modes I saw most often from the Department’s side of the file.
- Claiming more historical use than the record supports. A change is measured against what was actually put to beneficial use, not what the abstract says.
- Treating adverse effect as a formality. It is the whole case, and objectors read it closely.
- Missing the 120-day deficiency response, which terminates the application.
- Skipping the preapplication process and paying the full fee for a slower file.
Is this your situation?
Tell me what you’re trying to do. If there’s no path, I’d rather say so in the first hour.