All water rights services

DNRC form
Form 602I — Notice of Intent
Fee
$400
The clock
DNRC must authorize or deny within 10 business days of a complete Notice of Intent.
Anchored to
§85-2-306, MCAARM 36.12.101(12)HB 681 (2026-01-01)
Checked against DNRC

For decades the exempt-well rule was the quiet door around the permit system: a well producing 35 GPM or less and not more than 10 acre-feet a year needed no permit. The door is narrower than most people were told, and as of 2026-01-01 it has paperwork attached.

What HB 681 requires now. Before using water from a formerly exempt well, you file a Notice of Intent (Form 602I) with DNRC. The fee is $400, and the Department must authorize or deny within 10 business days. The project has to be completed and a Notice of Completion filed within five years, with one five-year extension available.

Why it changed. In Upper Missouri Waterkeeper v. DNRC (Montana First Judicial District, decided 2024-02-14), the court rejected the practice of letting a multi-phase subdivision claim a fresh 10-acre-foot exception for each phase. The combined appropriation rule in §85-2-306, MCA, is the operative limit: two or more wells or developed springs from the same source that together exceed 10 acre-feet per year require a permit, regardless of flow rate.

The practical version. If you are developing ground in phases, or you have more than one well, or you bought a lot on the assurance that the well was exempt — that assurance may have been written under the old reading. It is worth an hour to find out before it becomes a title problem.

I have written about this case and the policy around it at length; the disagreement there is with how the rule was administered, not with the people trying to comply with it.

Why these come back

The failure modes I saw most often from the Department’s side of the file.

  • Assuming each lot or phase gets its own 10 acre-feet. That reading is what the court struck down.
  • Drilling first and filing after. The Notice of Intent comes before use.
  • Counting flow rate only. The 10 acre-foot annual limit binds independently of the 35 GPM rate.

Is this your situation?

Tell me what you’re trying to do. If there’s no path, I’d rather say so in the first hour.

Tell me about your water

Consulting, not legal advice — not a law firm, and no attorney–client relationship. The regulatory details above were checked on 2026-09-23; the Department is the authority on its own process.