New Appropriation — Beneficial Water Use Permit
A permit for new water. In a state where most basins are spoken for, the question is rarely "how do I apply" — it's whether there is water left to appropriate at all.
- DNRC form
- Form 600
- The clock
- Statutory clocks: 180 days for applicant follow-up, 45 days for DNRC's technical analyses or credibility review, 120 days to answer a deficiency letter, then draft determination, comment, and the objection window.
- Anchored to
- §85-2-311, MCA§85-2-302, MCAARM 36.12.1401
- Checked against DNRC
A Beneficial Water Use Permit is how Montana authorizes a new appropriation — water that isn’t already attached to an existing right. Under §85-2-311, MCA you have to prove six things, and two of them do most of the killing.
Physical availability asks whether the water is actually there — in the amount, and in the season, you propose to take it. Legal availability asks a different question: whether it is still unspoken for after every senior right upstream and down has taken its share. A creek can run all summer and still have no legally available water in it.
Closed basins. Many Montana basins are closed or highly appropriated. In those, groundwater that is hydraulically connected to surface water is treated as surface water, and the analysis turns on net depletion — whether your pumping captures streamflow, and if so, what you will put back. Mitigation exists because a lot of basins have nothing left to give.
The honest first conversation. For a new appropriation, the most valuable hour is the one before the application, spent finding out whether there is a path at all. I would rather tell you there isn’t than bill you to discover it.
I spent two years reviewing exactly these applications for the Department — modeling what a proposed diversion would do to senior rights and instream flow, and working with applicants to shape permits that could actually be granted.
Why these come back
The failure modes I saw most often from the Department’s side of the file.
- The basin is closed or fully appropriated and the application never had a path. Finding that out first is cheaper than finding it out at determination.
- Physical availability proven, legal availability assumed. They are separate tests and the second one is harder.
- Groundwater treated as disconnected from the river. In most Montana alluvium it isn't, and net depletion is the question.